Elisa IndustrIQ’s sedApta factory scheduling tool is designed to optimize and automate the scheduling of work phases.
Material Management: Material availability is considered in the production plan, and material needs are synchronized with the actual production schedule.
Simulation and Alternative Scenarios: Comparison of alternative production plans through simulations based on key performance indicators.
As production volumes fragment and end-product variations increase, the complexity of factory scheduling in production grows.
In many companies, production planning remains a manual task, where ERP tools are often insufficient.
Simulation and evaluation of different alternative plans without an automated tool is virtually impossible
The system takes into account setup and changeover times between different products, as well as the skills and required qualifications of personnel resources